科研项目
1、国家自然科学青年基金:基于单元格的城市内施工场地动态安全布局优化模型研究(2015-2018),主持
2、北京市教委基金:强噪音影响下的脚手架杆件与工人不安全行为识别的机理研究(2021-2023),主持
3、北京市自然科学基金:基于深度学习的装配式建筑吊装安全风险预测与控制方法(2020-2023)(参与);
4、北京市自然科学基金:基于BIM的废弃混凝土资源化利用碳足迹前摄性度量研究(2020-2023)(参与);
5、企业咨询项目:抽水蓄能电站脚手架质量检测与安全预警方法研究(2019-2021),主持
6、企业咨询项目:冰上项目部BIm及智慧工地建设咨询合同(2018-2020),参与
7、企业咨询项目:哈尔滨站改造工程(2017-2020),参与
主要论文论著
[1]黄春,杨希温,蔺宏远,刘猛.考虑直角扣件失效的脚手架稳定性及振动特性研究[J].沈阳建筑大学学报(自然科学版),2020,36(05):779-787.
[2]李文杰,黄春,刘占省,蔺宏远.装配式构件施工现场吊装调度建模与优化[J].土木工程与管理学报,已录用
[3]刘猛,黄春,王京京,王文琦,张睿.基于混合整数线性规划的塔吊选型与布置优化[J].土木工程与管理学报, 2020, 37(02):142-150.
[4] Huang, C. and Wong, C. K. (2019). Optimization of Vertical Elevator Movements and Material Storage Locations for High-Rise Building Construction with Overtime Cost Effects. Journal of Computing in Civil Engineering, 33(1), 04018054.https://doi.org/10.1061/(ASCE)CP.1943 -5487.0000794
[5] Huang, C. and Wong, C. K. (2018). Optimization of crane setup location and servicing schedule for urgent material requests with non-homogeneous and non-fixed material supply. Automation in Construction, 89, 183-198. https://doi.org/10.1016/j. autcon. 2018.01.015
[6]刘猛,黄春.基于MILP算法的预制混凝土构件生产调度优化模型研究[J].工程管理学报,2018,32(06):121-126.
[7] C. Huang, and C.K. Wong, (2017), “Discretized cell modeling for optimal facility layout plans of unequal and irregular facilities”, Journal of Construction Engineering and Management (ASCE), 10.1061/(ASCE)CO.1943-7862.0001206 , 04016082.
[8] Zhang W X, Huang J, Li Z, C. Huang*. “An experimental study on the lateral pressure of fresh concrete in formwork”, Construction and Building Materials, 2016, 111: 450-460.
[9] C. Huang, and C.K. Wong, (2015), “Optimization of Site Layout Planning for Multiple Construction Stages with Safety Considerations and Requirements”, Automation in Construction, (53), 58–68.
[10] Fung, I.W.H., Huang, C. and Tam, C.M., (2013), Application of GA Optimization for Solving Precedent Relationship Problem in Project Scheduling, Mathematical and Computer Modeling, 57 (9-10), 2067–2081.
[11] C. Huang, C.K. Wong, and C. M. Tam. (2011). “Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming”, Automation in Construction, 20, 571–580.
[12] C. Huang, C.K. Wong, and C. M. Tam. (2010). “Optimization of Material Hoisting Operations and Storage Locations in Multi-Storey Building Construction by Mixed-Integer Programming”, Automation in Construction, 19 (5), 656-663.